Trucklover's Kitbuild '09 Summer Challenge
#21
I finished Steps 22 and 23 and then decided i better start weathering before i get to much further and it starts to get real difficult to reach tight spaces. This way, when new parts are added, i can weather them as i go to, and not have to worry about whether or not i will be able to reach all the areas that are blocked by other pieces lol

Steps 22 and 23 were to add the glue in place the side and back walls ontop of the Foundation Walls. The side wall is the one that the Bustle Pipe will protrude through once the Furnace Assembly is installed. I also glued in place the large H-Columns and the Brick Details around the bases of them, followed by the small H-Columns for the support beams for the Cast House Floor.

These pics show some weathering done on this Assembly. Next up ill post some shots of the weathered Furnace Assembly.

[Image: SL373346.jpg]

[Image: SL373347.jpg]

[Image: SL373348.jpg]

[Image: SL373349.jpg]
Josh Mader

Maders Trains
Offering everyday low prices for the Model Railroad World
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)