06-15-2009, 06:57 PM
I finished weathering the furnace assembly. It wasnt easy, there are so many nooks and crannies and angles, it took about 2 hours to do, and i still didnt get everything lol. i had to take a few breaks here and there, because i just couldnt sit through the weathering of the whole thing lol.
![[Image: SL373350.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373350.jpg)
![[Image: SL373351.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373351.jpg)
Its a little hard to see the weathering on the furnace from the pictures, but it looks darker and dirtier in person lol. The bottom half has not been weathered, and if it can be seen when looking into the building, then those faces will be weathered as well....
Up until this point, i have been working on the Blast Furnace for about 13-1/2 hours
![[Image: SL373350.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373350.jpg)
![[Image: SL373351.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373351.jpg)
Its a little hard to see the weathering on the furnace from the pictures, but it looks darker and dirtier in person lol. The bottom half has not been weathered, and if it can be seen when looking into the building, then those faces will be weathered as well....
Up until this point, i have been working on the Blast Furnace for about 13-1/2 hours