06-22-2009, 06:11 PM
I took a bit of a break on the Blast Furnace, havnt worked on it in a few days, but this morning i got back at it.
I managed to complete a few steps.
These first 2 pictures show steps 36-40. These involved:
Steps 40-42 were to gluw the Stove Platform to the tops of the 3 Stoves, and glue the Elevator pieces together. The Elevator was weathered before it was glued in place:
Time spent on this kit now is about 24-1/2 hours
I managed to complete a few steps.
These first 2 pictures show steps 36-40. These involved:
- 1. Gluing the Stove Base/Foundation together
2. Gluing the Lower Stack Halves and the Stack Breach Halves together.
3. Gluing the Stack Riser Halves together
4. Cutting the holes in the 6 Stove Halves. 3 of them had to have 2 holes drilled, and the other 3 had to have 1 hole drilled in them.
5. Gluing the Stove Halves together
6. Gluing the Stove Halves, Lower Stack/Stack Breach Pipes, and the Stack Riser Pipes to the Foundation.
7. Glue the Upper Stack Halves together and then to the Lower Stack Pipe
Steps 40-42 were to gluw the Stove Platform to the tops of the 3 Stoves, and glue the Elevator pieces together. The Elevator was weathered before it was glued in place:
Time spent on this kit now is about 24-1/2 hours