I took a bit of a break on the Blast Furnace, havnt worked on it in a few days, but this morning i got back at it.

I managed to complete a few steps.

These first 2 pictures show steps 36-40. These involved:
  • 1. Gluing the Stove Base/Foundation together
    2. Gluing the Lower Stack Halves and the Stack Breach Halves together.
    3. Gluing the Stack Riser Halves together
    4. Cutting the holes in the 6 Stove Halves. 3 of them had to have 2 holes drilled, and the other 3 had to have 1 hole drilled in them.
    5. Gluing the Stove Halves together
    6. Gluing the Stove Halves, Lower Stack/Stack Breach Pipes, and the Stack Riser Pipes to the Foundation.
    7. Glue the Upper Stack Halves together and then to the Lower Stack Pipe

[Image: SL373378.jpg]

[Image: SL373379.jpg]


Steps 40-42 were to gluw the Stove Platform to the tops of the 3 Stoves, and glue the Elevator pieces together. The Elevator was weathered before it was glued in place:

[Image: SL373380.jpg]

[Image: SL373381.jpg]


Time spent on this kit now is about 24-1/2 hours