An engine servicing facility for the JGL
Thanks Wayne and Pete, looks like contact cement is the way to go, I am only concerned with getting the sheet on alighned correctly. I haven't had a chance to do any work on the projext since I last wrote, and will be away for a few days so nothing will happen till the end of the week. Once I've sanded the plywood I should be able to form the brick sheet around the corners with the top course of brick parallel with the top of the plywood. The top is level but the bottom is not as the subroadbed is on a grade. As long as I can get the brick sheet to go around two corners and leave me with vertical edges on the long walls to butt up against on first attempt I should be ok! Shouldn't be a problem to put the bends in the sheet and make "dry" runs to make sure all is correct. Thanks again for the info, I can't wait to get back and get going on this.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)