09-16-2009, 10:16 AM
Last night i got to weathering the Pipe Supports, Clean Gas Pipes, Burner Feeds, Lower and Upper Stove Pipes, and the Hot Blast Main Pipe.
After i had weathered those i started on the Gas Collector Tank, Gas Washer Tank, and the Gas Washer Pipes. I assembled those and then glued the supports to the bottoms of the tanks. Took them out back and sprayed them with the rattle can. When they were dry, i weathered them and then glued the tanks to the base in there appropriate slots. Put the Gas Washer Pipes in and glued it in place. Connected the Clean Gas Pipe to the Large pipe atop the small Gas Collector Tank and glued in place. This is where we are at now with the project
![[Image: SL373434.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373434.jpg)
![[Image: SL373435.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373435.jpg)
![[Image: SL373437.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373437.jpg)
![[Image: SL373438.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373438.jpg)
![[Image: SL373440.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373440.jpg)
![[Image: SL373441.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373441.jpg)
Time spent on the project now is up to 39-1/2 hours
After i had weathered those i started on the Gas Collector Tank, Gas Washer Tank, and the Gas Washer Pipes. I assembled those and then glued the supports to the bottoms of the tanks. Took them out back and sprayed them with the rattle can. When they were dry, i weathered them and then glued the tanks to the base in there appropriate slots. Put the Gas Washer Pipes in and glued it in place. Connected the Clean Gas Pipe to the Large pipe atop the small Gas Collector Tank and glued in place. This is where we are at now with the project
![[Image: SL373434.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373434.jpg)
![[Image: SL373435.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373435.jpg)
![[Image: SL373437.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373437.jpg)
![[Image: SL373438.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373438.jpg)
![[Image: SL373440.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373440.jpg)
![[Image: SL373441.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Steel%20Mill%20Buildings/Blast%20Furnace/SL373441.jpg)
Time spent on the project now is up to 39-1/2 hours