Ezday's scratchbuild 09 summer challenge
#21
Here's some shots that I took just a week ago of the roof details.

Here is the next step on the roof. In the foreground are the components of the HVAC system. The ductwork is cut from rectangular sprues. Also note that I've added a chimney to the roof and back wall and the upper facade trim in in place.
   

Here is the HVAC in place
   

I decided to back light the signs so I had to cut out a hole to put the LED's in place. I covered the hole with an overlay with the right size hole in it and glued the sign to a transparent backing. Note that in the second picture, the roof has gravel on it and there is some weathering.
   
   
Don (ezdays) Day
Board administrator and
founder of the CANYON STATE RAILROAD
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)