10-09-2009, 08:02 PM
If you extended the one track to run along the length of the "depot", you could use the little 25-tonner that Sumpter mentioned. It could run up and down with an attendant flat car picking up supplies to be loaded on the work train waiting on one of the other shorter tracks. If it was powered, it might switch the necessary cars right out of the work train.
<!-- m --><a class="postlink" href="http://www.walthers.com/exec/productinfo/932-5611">http://www.walthers.com/exec/productinfo/932-5611</a><!-- m -->
Backdated or not, powered or not, it's a neat little contraption...!
Andrew
<!-- m --><a class="postlink" href="http://www.walthers.com/exec/productinfo/932-5611">http://www.walthers.com/exec/productinfo/932-5611</a><!-- m -->
Backdated or not, powered or not, it's a neat little contraption...!

Andrew
