10-18-2009, 10:24 PM
I have planned this layout to have 3 Islands of modules on the Top Deck of the layout. One (1) island can be hooked up at a time to the top deck. When switching is done on the Island, the modules will be taken down and stored away. Then, another island can be brought in from storage and hooked up to the top deck. Ill build a set of legs to go with the three (3) islands and make them interchangeable so that they can be used on any one of the three (3) islands. Storage for the modules will be under the lower deck of the layout
This first picture is of the Top Deck with Island Module #1, or the Del Monte Island
![[Image: Module1.png]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Layotus%20and%20Modules/Modesto%20Layout/Trackplan/Module1.png)
The Del Monte Module has two (2) modules that are 60" long x 32" wide. Tracks will serve the backs of the structures. The gray areas next to the buildings are Truck Dock Ramps and Loading Docks. The loading docks along the tracks will be covered docks with overhangs and platforms.
This first picture is of the Top Deck with Island Module #1, or the Del Monte Island
![[Image: Module1.png]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Layotus%20and%20Modules/Modesto%20Layout/Trackplan/Module1.png)
The Del Monte Module has two (2) modules that are 60" long x 32" wide. Tracks will serve the backs of the structures. The gray areas next to the buildings are Truck Dock Ramps and Loading Docks. The loading docks along the tracks will be covered docks with overhangs and platforms.