Rough operations plan for small switching layout
#12
steinjr Wrote:
Brakie Wrote:Stein,Looking over your track plan there is one thing I would add to make my crew hahppy-a short run around.I would add a crossover just beyond the export elevator switch..

Umm - there is already a crossover just beyond (ie - to the left of) the export elevator turnout.

Do you mean putting yet another crossover to the *right* of the elevator turnout ?

Stein

Yes,that would be your short run around.It saves time and the need to interfere with the industry(the flat building) loading/unloading their cars.
Larry
Engineman

Summerset Ry

Make Safety your first thought, Not your last!  Safety First!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)