01-03-2010, 06:21 AM
Well, 2010 is only 3 days old and I can knock off the first item on the list.
So now I am left with:
1. Re-Align track at Cataract (smaller than minimum radius curve found, radius also kinked).
2. Put decoders in 9 locomotives.
3. Two locomoives to bash into one.
4. Check couplers and weight on 35 pieces of rolling stock (and counting).
5. An 18cm high by 62cm long trestle to build.
6. About 30 structures to build (so far).
7. Scenery to do on a 5.3sq metre layout.
![Goldth Goldth](https://bigbluetrains.com/images/smilies/extra/goldth.gif)
So now I am left with:
1. Re-Align track at Cataract (smaller than minimum radius curve found, radius also kinked).
2. Put decoders in 9 locomotives.
3. Two locomoives to bash into one.
4. Check couplers and weight on 35 pieces of rolling stock (and counting).
5. An 18cm high by 62cm long trestle to build.
6. About 30 structures to build (so far).
7. Scenery to do on a 5.3sq metre layout.
Will Annand
CVR in N Scale
<!-- w --><a class="postlink" href="http://www.muskokacomputes.com/CVR-Home.html">www.muskokacomputes.com/CVR-Home.html</a><!-- w -->
CVR in N Scale
<!-- w --><a class="postlink" href="http://www.muskokacomputes.com/CVR-Home.html">www.muskokacomputes.com/CVR-Home.html</a><!-- w -->