01-24-2010, 06:46 AM
Ok, January is 3/4 finished... What have I accomplished?
1. Re-Align track at Cataract (smaller than minimum radius curve found, radius also kinked). Completed.
2. Three decoders installed. Check.
So now I am left with:
2. Put decoders in 6 locomotives.
3. Two locomoives to bash into one.
4. Check couplers and weight on 35 pieces of rolling stock (and counting).
5. An 18cm high by 62cm long trestle to build.
6. About 34 structures to build (so far). (added 4 new strucres to the pile)
7. Scenery to do on a 5.3sq metre layout.
1. Re-Align track at Cataract (smaller than minimum radius curve found, radius also kinked). Completed.
2. Three decoders installed. Check.
So now I am left with:
2. Put decoders in 6 locomotives.
3. Two locomoives to bash into one.
4. Check couplers and weight on 35 pieces of rolling stock (and counting).
5. An 18cm high by 62cm long trestle to build.
6. About 34 structures to build (so far). (added 4 new strucres to the pile)
7. Scenery to do on a 5.3sq metre layout.
Will Annand
CVR in N Scale