01-24-2010, 11:20 PM
Here is a picture of our layout just after I finished setting up for the OT&W train show in Lehi, UT. I set it up by myself and took about two hours (It was the first time I had done the table skirts, we just made them last week, plus they made me move the layout over a little so I had to relevel it). I was the first working layout by several hours at the setup, people were very impressed in how quickly I was able to get setup.
Here is a picture of the layout during the show, we were often surrounded by lots of people and we had a very fun time.
Here is a picture of the layout during the show, we were often surrounded by lots of people and we had a very fun time.
Scott