01-25-2010, 06:49 AM
Not to worry Gus.
I seems like everytime I get an item done, there is more added to the list.
Like this month, I got 3 decoders in and almost all the track redone. But I added four new strctures to the pile.
Plus the final item "7. Scenery to do on a 5.3sq metre layout." can be split into several steps, from Terraforming, through ballasting, through super detailing like running the telegraph wire along beside the tracks.
So not to worry, the list seems to be self replicating.
I seems like everytime I get an item done, there is more added to the list.
Like this month, I got 3 decoders in and almost all the track redone. But I added four new strctures to the pile.
Plus the final item "7. Scenery to do on a 5.3sq metre layout." can be split into several steps, from Terraforming, through ballasting, through super detailing like running the telegraph wire along beside the tracks.
So not to worry, the list seems to be self replicating.
Will Annand
CVR in N Scale
<!-- w --><a class="postlink" href="http://www.muskokacomputes.com/CVR-Home.html">www.muskokacomputes.com/CVR-Home.html</a><!-- w -->
CVR in N Scale
<!-- w --><a class="postlink" href="http://www.muskokacomputes.com/CVR-Home.html">www.muskokacomputes.com/CVR-Home.html</a><!-- w -->
