01-31-2010, 06:07 PM
Everything is looking good, Reinhard. And good idea on the microswitch... did you really have a loco take the big drop?
Even though my layout will be designed as a point-to-point, I will have a removable bridge across the door of the building just in case I want to simply sit back and watch a train go round. or, if I am on the layout tour, the continuous run would be good. I'll follow your lead and install a switch for when the bridge is not there.
Even though my layout will be designed as a point-to-point, I will have a removable bridge across the door of the building just in case I want to simply sit back and watch a train go round. or, if I am on the layout tour, the continuous run would be good. I'll follow your lead and install a switch for when the bridge is not there.
Three Foot Rule In Effect At All Times