UK freight trains
#17
Just had a reply from a train driver I know (passenger trains, though). He says we use a two-pipe brake system, one for brake operation, the other to keep reservoirs at full pressure. I suppose this reservoir air could be used for the hopper doors, or maybe there is an installed air supply at the discharge site (coal fired power station).
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)