02-20-2010, 04:48 PM
Hello everyone. I've been working on the station when I could make time (and didn't choose to run trains instead of working!) It turned out the shingles were made by Bollinger and just to make sure I didn't have the problems I feared with humidity affecting the strength of the adhesive bond, I used Titebond in addition to the self adhesive backing. Sure was tedious! A few pics.
Still not done, the roofs are just sitting in place as are the cupola and chimneys. Still have to attach the gingerbread.
The other side. I will replace the fascia with something more cosmetically appealing.
A view from the left side where thee is a siding for a motorcar. I need to make a sign to hang from the roof, remove the ballast under the platform framing, and cut and stain the planks for the platform.
Still not done, the roofs are just sitting in place as are the cupola and chimneys. Still have to attach the gingerbread.
The other side. I will replace the fascia with something more cosmetically appealing.
A view from the left side where thee is a siding for a motorcar. I need to make a sign to hang from the roof, remove the ballast under the platform framing, and cut and stain the planks for the platform.