05-27-2010, 08:02 AM
Sumpter250 Wrote:Jim,
I imported the Moneek "Eureka" Bridge drawing into autocad. I'll create the full size drawing, and then scale it to HO (1:87). In the process, I'll hold the width to 6', which is sufficient for a walkway. I'll need five spans to get from the shore line to the bridge tender's shack......I may redesign for a slightly longer span, we'll see what can be done. If it isn't feasible, I'll have to give the Hadley bridge a try.
Pete as long as you are not concerned with a large load being a foot bridge don't see why you could not stretch it out to 40 ft. easely. will awate the first pics
jim
