05-29-2010, 06:45 PM
This thread is a great insight into the building of a layout TN, right from the first ideas, to the problems, your innovative solutions and the implementation of the plan. A most positive read for any aspiring RR Mogul.
I was wondering on the logistics of the running of your empire, as it runs through three separate states with seemingly no visual control from one state to the other. Do you require 3 fat controllers to manage a state ( Room ) each, so a wayward train or electrical glitch is easily fixed on the spot? Or do you commute between states to enable a smooth running? And from which room is the control cab operated, or as I guess, you can move around the layout with plug-ins at various places?
Keep your workers employed building the RR 'cause they are doing a wonderful job.
Jack
I was wondering on the logistics of the running of your empire, as it runs through three separate states with seemingly no visual control from one state to the other. Do you require 3 fat controllers to manage a state ( Room ) each, so a wayward train or electrical glitch is easily fixed on the spot? Or do you commute between states to enable a smooth running? And from which room is the control cab operated, or as I guess, you can move around the layout with plug-ins at various places?
Keep your workers employed building the RR 'cause they are doing a wonderful job.
Jack
LIFE....
..... Abandon the search for truth
Look for a good fantasy
..... Abandon the search for truth
Look for a good fantasy
