The 2010 Summer Structure Challenge is here
#17
I think I have something in mind

But mine wont just be simply one structure.... I see we have until September 7th to complete this challenge, but I want to know if what i have in mind will be okay LOL

Some of you guys may have seen the thread i started about the Hotel Under Construction module... This is what im thinking for this challenge. I havnt worked on it in a while, but this should motivate me to get going again on it.I will be doing an entire module, and it will consist of 2 structures (2 hotel towers under construction) with a walkway bridge connecting the 2. Large cranes, tons of construction equipment, and a typical messy job site will all top off the scene. Im not sure what size module I will be building, but I was thinking something that was 2x4 or 2x5' to allow plenty of room for lots of details to the construction site...

So my question, with what I just described above, would this be okay for my entry to this challenge?
Josh Mader

Maders Trains
Offering everyday low prices for the Model Railroad World
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)