How would this be switched?
#3
Assuming industry "A" and "B" are labeled as "1" and "2" on your track chart... I would uncouple on the main and run head first into industry "A", pulling the car that needs to be pulled and then go to industry "B" pulling that car, leaving both in the siding. Then I would back out to my train on the main, couple up, and pull forward, dropping the cabin on the main by the siding. Then I would pull past the switch, back in on the 2 cars I left there to be picked up, then pull forward to clear the siding, and back onto the cabin (or if on a grade release the brake and let it coast down onto the train).
-Dave
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)