06-19-2010, 11:24 AM
Got the temporary walkway up for the right side of the bridge. Ive only done the walkway for the section of railing that has already been poured. I mounted some 4x4 posts extended out from under the bridge, and then glued 2 2x10's atop them. I havnt made the railing for this walkway yet, that will be the next thing I do. The tricky part is going to be extending the walkway, and making the form for the new section of concrete railing for the bridge....
![[Image: SL370063.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Layotus%20and%20Modules/CAT%20Rental%20Module/SL370063.jpg)
![[Image: SL370063.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/Layotus%20and%20Modules/CAT%20Rental%20Module/SL370063.jpg)
