06-25-2010, 03:05 PM
Shortliner, here are some of the options I have.
First, I could come from the middle yard and hide the track behind trees and scenery.
![[Image: image.php?album_id=158&image_id=2632]](http://www.the-gauge.net/forum/gallery/image.php?album_id=158&image_id=2632)
Or I could go through the wall, allowing the train to go out of sight of the operator - of course, it would appear on the other side - but again, the tracks could be hidden with stuff.
![[Image: image.php?album_id=158&image_id=2633]](http://www.the-gauge.net/forum/gallery/image.php?album_id=158&image_id=2633)
Lastly, I could place the branch over by the SP interchange, and put the track behind trees and building flats.
![[Image: image.php?album_id=158&image_id=2634]](http://www.the-gauge.net/forum/gallery/image.php?album_id=158&image_id=2634)
Comments?
First, I could come from the middle yard and hide the track behind trees and scenery.
Or I could go through the wall, allowing the train to go out of sight of the operator - of course, it would appear on the other side - but again, the tracks could be hidden with stuff.
Lastly, I could place the branch over by the SP interchange, and put the track behind trees and building flats.
Comments?
Three Foot Rule In Effect At All Times
