I have started to redo the building after the first version fulfilled it's purpose as a proof of concept.
Two mayor design flaws have to be corrected
- The walls must not be a single sheet of 1/25" styrene but about the correct size of a wall. The walls are very visible at the backside and all loading docks.
- The roof must be a removable section permitting detailing until everything has been finished. It might be glued in place at the very end of the construction.
A first shot of the new walls made of two layers with a distance layer in between (1,5mm + 1,5 mm + 1mm = 4mm / 0.16°)
Two mayor design flaws have to be corrected
- The walls must not be a single sheet of 1/25" styrene but about the correct size of a wall. The walls are very visible at the backside and all loading docks.
- The roof must be a removable section permitting detailing until everything has been finished. It might be glued in place at the very end of the construction.
A first shot of the new walls made of two layers with a distance layer in between (1,5mm + 1,5 mm + 1mm = 4mm / 0.16°)