07-15-2010, 12:33 AM
I am in the process of restructuring the right hand corner. It should match the modern and open style the middle part has been changed to during the last weeks. This is the current view as I see it from my default seat.
![[Image: Img_0106.jpg]](http://rubpeters.ru.funpic.de/work/Img_0106.jpg)
The birds view shows a new street has been added at the right end of the layout. The street is a defined end and very useful in front of the glass door where a backdrop is not suitable. The three tracks are more structured. One serves the new industry under construction at the wall, the middle serving some more (off the layout) industries and crosses the street and the front serves the triangle area.
I am uncertain how to proceed with the triangle area. Options under investigation are
1. No more buildings. Just an open space used as a parking lot and may be used as a team track.
2. KFC restaurant with a nice and clean parking lot http://www.rd-hobby.de/shopping/catalog....&item=3448
3. substandard diner with a rotten parking lot http://www.rd-hobby.de/shopping/catalog....item=18469
Option 1,2 and 3 assume a former industry in the triangle was the purpose of the track. The track is no longer in use or only a storage track wit a lot of growing grass etc.
4. small rectangular industry at the track, free space used for trucks serving the industry
5. larger building with triangle shape fitting excatly in the spot
All options must support the removable section in front of the glass door. You see the break of the sections in the triangle area. Your opinion is very welcome.
![[Image: Img_0105.jpg]](http://rubpeters.ru.funpic.de/work/Img_0105.jpg)
ps. The SP switcher has been added to make P5se Camelback feel more home on a north eastern named layout...
![[Image: Img_0106.jpg]](http://rubpeters.ru.funpic.de/work/Img_0106.jpg)
The birds view shows a new street has been added at the right end of the layout. The street is a defined end and very useful in front of the glass door where a backdrop is not suitable. The three tracks are more structured. One serves the new industry under construction at the wall, the middle serving some more (off the layout) industries and crosses the street and the front serves the triangle area.
I am uncertain how to proceed with the triangle area. Options under investigation are
1. No more buildings. Just an open space used as a parking lot and may be used as a team track.
2. KFC restaurant with a nice and clean parking lot http://www.rd-hobby.de/shopping/catalog....&item=3448
3. substandard diner with a rotten parking lot http://www.rd-hobby.de/shopping/catalog....item=18469
Option 1,2 and 3 assume a former industry in the triangle was the purpose of the track. The track is no longer in use or only a storage track wit a lot of growing grass etc.
4. small rectangular industry at the track, free space used for trucks serving the industry
5. larger building with triangle shape fitting excatly in the spot
All options must support the removable section in front of the glass door. You see the break of the sections in the triangle area. Your opinion is very welcome.
![[Image: Img_0105.jpg]](http://rubpeters.ru.funpic.de/work/Img_0105.jpg)
ps. The SP switcher has been added to make P5se Camelback feel more home on a north eastern named layout...

Reinhard