07-15-2010, 04:44 PM
the Benchwork is very low so seeing over a divider sis no problem, I plan to do most operating from a chair so It will can be at Eye-level.
For the operating scheme, all I know so far is that a local will come out of staging, switch industries and then return to staging, I will also have passenger service and some freight trains passing trough.
I have been thinking about replacing the switching area in front of staging with a small freight yard, I would then have 2-3 operators, one for the freight yard, one local switcher, and somebody doing passenger service.
For the operating scheme, all I know so far is that a local will come out of staging, switch industries and then return to staging, I will also have passenger service and some freight trains passing trough.
I have been thinking about replacing the switching area in front of staging with a small freight yard, I would then have 2-3 operators, one for the freight yard, one local switcher, and somebody doing passenger service.
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Modeling the Lebanon Industrial Railway (LIRY)