07-16-2010, 07:07 PM
Got some more work done on Module #4 of this project today. i laid the rest of the Central Valley Tie Strips and placed the Walthers #6 Turnouts and Atlas 12.5 degree crossing. The last turnout to go on this module will be a Walthers #5 WYE, but it is not in stock and backordered till August, so I wont have it for a while...
The mainline was laid out down the length of the module. Its Atlas Code 83 Flex with Concrete Ties laid on Woodland Scenics Foam Roadbed. This will be the only elevated track, and it is only slightly elevated.
Im waiting for Micro Engineering Code 70 Rail to come in, so as soon as that comes in ill be able to lay the rest of the track and complete the yard. After that, ground throws will be installed, and then it will be ballasted.
Here are some quick pictures that show the recent track laid with some Cushion Coil Cars and 53' Thrall Gondolas on the track to give you an idea of how many cars this yard will be able to hold.
![[Image: SL370001.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/The%20Gauge/La%20Mirada/Module%205/SL370001.jpg)
![[Image: SL370002.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/The%20Gauge/La%20Mirada/Module%205/SL370002.jpg)
![[Image: SL370003.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/The%20Gauge/La%20Mirada/Module%205/SL370003.jpg)
![[Image: SL370004.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/The%20Gauge/La%20Mirada/Module%205/SL370004.jpg)
![[Image: SL370005.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/The%20Gauge/La%20Mirada/Module%205/SL370005.jpg)
Attached below is a picture of the section im working on right now
The mainline was laid out down the length of the module. Its Atlas Code 83 Flex with Concrete Ties laid on Woodland Scenics Foam Roadbed. This will be the only elevated track, and it is only slightly elevated.
Im waiting for Micro Engineering Code 70 Rail to come in, so as soon as that comes in ill be able to lay the rest of the track and complete the yard. After that, ground throws will be installed, and then it will be ballasted.
Here are some quick pictures that show the recent track laid with some Cushion Coil Cars and 53' Thrall Gondolas on the track to give you an idea of how many cars this yard will be able to hold.
![[Image: SL370001.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/The%20Gauge/La%20Mirada/Module%205/SL370001.jpg)
![[Image: SL370002.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/The%20Gauge/La%20Mirada/Module%205/SL370002.jpg)
![[Image: SL370003.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/The%20Gauge/La%20Mirada/Module%205/SL370003.jpg)
![[Image: SL370004.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/The%20Gauge/La%20Mirada/Module%205/SL370004.jpg)
![[Image: SL370005.jpg]](http://i200.photobucket.com/albums/aa46/bnsfcsxcnw/The%20Gauge/La%20Mirada/Module%205/SL370005.jpg)
Attached below is a picture of the section im working on right now
