07-22-2010, 06:29 PM
Thanks for the nice comments guys! Much appreciated!
Hey Gary, I started the benchwork in 1994, a year after we moved into the house. Its been a gradual project since then, with a major revision when we needed electrical work in the ceiling. I had to break up the layout to accommodate the electrician and then reconfigured it to its present better design. The original design had a duck under that I always scraped my back on.
Ralph
Gary S Wrote:How long ago did you start on this layout? You've obviously put a ton of effort into it.
Hey Gary, I started the benchwork in 1994, a year after we moved into the house. Its been a gradual project since then, with a major revision when we needed electrical work in the ceiling. I had to break up the layout to accommodate the electrician and then reconfigured it to its present better design. The original design had a duck under that I always scraped my back on.

Ralph