07-27-2010, 10:30 PM
Nothing to exciting yet, But i cut poles and cross beams for two more bridges, the pole are shown in the below photo. I did begin to add a transmission arm on the right hand pole, but i do not like how it looks, i may have to cut a larger piece. Luckily, they are cut the same length as the other transmission arms, so i can unsolder and re-use them.
When i get this bridge and the second bridge built, i can hang wire between the 4 existing sections.
When i get this bridge and the second bridge built, i can hang wire between the 4 existing sections.
![[Image: 72710stufffrommikefoleyu.jpg]](http://img828.imageshack.us/img828/7756/72710stufffrommikefoleyu.jpg)
Modeling New Jersey Under the Wire 1978-1979.
![[Image: logosmall.png]](http://i543.photobucket.com/albums/gg445/CAB_IV/Model%20Trains%202013/logosmall.png)