08-02-2010, 06:49 PM
The second main track is laid and ready for some tweaking. I ran a couple trains around with no derailments so I feel pretty lucky.
Here is a picture at the curve at the summit where there will be 4 tracks to the mainline when I'm done.
I have decided to finish the track laying before I do any scenery. I think it is easier to fix the track without the scenery in the way.
Charlie
Here is a picture at the curve at the summit where there will be 4 tracks to the mainline when I'm done.
I have decided to finish the track laying before I do any scenery. I think it is easier to fix the track without the scenery in the way.
Charlie
