08-08-2010, 12:27 PM
Kevin, I am already drooling over having a train going across the bridge.
Mister Nutbar, thanks!
Now, more work in the train room.
Connected a six foot level and a piece of track to the bridge so I could lay the assembly across the existing tracks and have it at the correct level. Then used a smalle level to lay out the spots where the bents go. The third photo is of the styrene sheet I am using for the concrete under the bridge. I'll also be building a road bridge next to the aisle, so the concrete will be extended under that too eventually.
Mister Nutbar, thanks!
Now, more work in the train room.
Connected a six foot level and a piece of track to the bridge so I could lay the assembly across the existing tracks and have it at the correct level. Then used a smalle level to lay out the spots where the bents go. The third photo is of the styrene sheet I am using for the concrete under the bridge. I'll also be building a road bridge next to the aisle, so the concrete will be extended under that too eventually.
Three Foot Rule In Effect At All Times