08-19-2010, 01:20 PM
Good stuff my friend. I love the middle shot with the HHP-8.
Perhaps though, you could kill two birds with one stone. If you have to ballast, maybe you could rework the wire at the same time. Maybe just a section or two of wire at a time, and just remove the old stuff, ballast that track, then install some newer smoother wire. Don't have to tear down the whole layout, just a little bit at a time.
Chris
Perhaps though, you could kill two birds with one stone. If you have to ballast, maybe you could rework the wire at the same time. Maybe just a section or two of wire at a time, and just remove the old stuff, ballast that track, then install some newer smoother wire. Don't have to tear down the whole layout, just a little bit at a time.
Chris
Modeling New Jersey Under the Wire 1978-1979.
![[Image: logosmall.png]](http://i543.photobucket.com/albums/gg445/CAB_IV/Model%20Trains%202013/logosmall.png)