08-28-2010, 01:28 PM
Finally got back to the bridge today. Ballast time. Haven't put the gloss coat on the water yet, figured it best to get the ballast work and other stuff done, leaving the varnish for last. Don't want stuff dripping on it.
Spreading ballast in the middle of the bridge
Some dirt around the abutement. Will add ballast over the top of this.
And some glue. This was a bit different then I had done before because the bridge sides trap the excess glue as compared to normal ballasting where the excess alcohol and glue runs off.
Spreading ballast in the middle of the bridge
Some dirt around the abutement. Will add ballast over the top of this.
And some glue. This was a bit different then I had done before because the bridge sides trap the excess glue as compared to normal ballasting where the excess alcohol and glue runs off.
Three Foot Rule In Effect At All Times
