Scratchbuild - Another Bridge Project
#82
Thanks S250. Next will come the installation of the bents in the water. Only thing I can think to do is cut out holes in the joint compound, place the bents into the holes, then very carefully add joint compound back in around the piles, then sand smooth and level to the existing water with an emory board cut to a point.

Or, possibly just cutting the piles to the exact needed length and letting them sit on top of the water?

Hmmm... thoughts anyone?
Three Foot Rule In Effect At All Times
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)