10-01-2010, 09:44 PM
Hey Guys,
I was able to get all the trackwork done this week and along with all the trackwiring, minus the switchers.
These means it is time to:
RUN TRAINS
Well maybe I should wire up my tortoises first...
I was able to do some testing and so far the only dead spots I have are the switches which I have not wired up yet. Once they are completed I can make up some switching scenarios and practice my switching. This also means that I can start on Scnenery and get to cracking on the buildings...
Here is my test train The Redmond Switcher shoving cars into the Ponderosa Moulding lead.
I was able to get all the trackwork done this week and along with all the trackwiring, minus the switchers.
These means it is time to:
RUN TRAINS
Well maybe I should wire up my tortoises first...
I was able to do some testing and so far the only dead spots I have are the switches which I have not wired up yet. Once they are completed I can make up some switching scenarios and practice my switching. This also means that I can start on Scnenery and get to cracking on the buildings...
Here is my test train The Redmond Switcher shoving cars into the Ponderosa Moulding lead.
