10-03-2010, 01:02 PM
Stripes done. On to the weathering. The areas with the blue tape will be the sidewalks.
Three Foot Rule In Effect At All Times
|
Bridge at 69th Street
|
|
« Next Oldest | Next Newest »
|
| Messages In This Thread |