10-03-2010, 07:00 PM
Got sidetracked for a while, but did some more work on the bridge.
I added the through girder section on the part of the bridge that crosses the 2 track line along the river. It was a left over part from my parts box , I think it's a Central Vally part and it fit perfectly.
The next tedious part was the splice plates. I cut them out of styrene and embossed rivets with my NWSL riveter.
As you can see ther will be a lot of them.
I added the through girder section on the part of the bridge that crosses the 2 track line along the river. It was a left over part from my parts box , I think it's a Central Vally part and it fit perfectly.
The next tedious part was the splice plates. I cut them out of styrene and embossed rivets with my NWSL riveter.
As you can see ther will be a lot of them.
My other car is a locomotive, ARHS restoration crew
