10-15-2010, 01:41 PM
The inner track at the bottom right (the line that goes to the Furniture Factory) already acts like a drill track (yard / switching lead).
Since the two stub ended sidings face "south" it makes sense to simply use the track arrangement as is. A drill track as drawn in red is not able to serve those two stub ended tracks.
Andrew
Since the two stub ended sidings face "south" it makes sense to simply use the track arrangement as is. A drill track as drawn in red is not able to serve those two stub ended tracks.
Andrew
