Scubadude's Texas & Carolina RR
#11
The inner track at the bottom right (the line that goes to the Furniture Factory) already acts like a drill track (yard / switching lead).

Since the two stub ended sidings face "south" it makes sense to simply use the track arrangement as is. A drill track as drawn in red is not able to serve those two stub ended tracks.

Andrew
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)