11-25-2010, 11:06 PM
Well I have been testing my layout and not been doing much in the way of layout progress. I did have an issue with a curve on the layout so I decided to go ahead and remove it and replace the CVMW ties with a piece of ME flex track. So now with the new piece in place I can resume testing my operations.
