TPBO
#82
Ed,As I mention in the Trinidad Benham Corp topic I have a 12½" x 7" x 5½" building that must be placed on the lower left front of the layout. I'm not sure how this will work out.Construction of Slate Creek will commence in earnest after the holidays since I am tired of not having a layout..

I have a plan in my head.There will be 3 flat background buildings,the municipal power plant,the printing company,a produce distributor and team track.

I am thinking about replacing the plastic buildings with scratchbuilt modern "box" structures made from mat board.
Larry
Engineman

Summerset Ry

Make Safety your first thought, Not your last!  Safety First!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)