12-10-2010, 02:38 AM
Stein;
The more I think about this, the more I am inclined to go with putting a second "box car intensive" industry on the plan and go with the covered hoppers being unloaded on the team (trans-load) track. Don't really see any need to add yet another track to the plan - at least not for now.
Having experimented some with switching this configuration on the temporary track this evening - it works very well and once again, adds something "a little different". More variety for the team track and would make an interesting mini-scene in itself, with the portable conveyor and a truck being loaded from the car, as in the photo I posted.
Now I'm on a quest to find a suitable replacement industry for the Trinidad Benham facility. Most likely some sort of distribution/storage warehouse facility.
The more I think about this, the more I am inclined to go with putting a second "box car intensive" industry on the plan and go with the covered hoppers being unloaded on the team (trans-load) track. Don't really see any need to add yet another track to the plan - at least not for now.
Having experimented some with switching this configuration on the temporary track this evening - it works very well and once again, adds something "a little different". More variety for the team track and would make an interesting mini-scene in itself, with the portable conveyor and a truck being loaded from the car, as in the photo I posted.
Now I'm on a quest to find a suitable replacement industry for the Trinidad Benham facility. Most likely some sort of distribution/storage warehouse facility.
Ed
"Friends don't let friends build Timesavers"
"Friends don't let friends build Timesavers"
