12-15-2010, 11:01 PM
I will Finally be getting the Foam for my layout tomorrow!!!
I will be laying the track tomorrow, then spend the weekend carving the foam and doing wiring for the track.
I will be laying the track tomorrow, then spend the weekend carving the foam and doing wiring for the track.
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Modeling the Lebanon Industrial Railway (LIRY)
