01-24-2011, 08:45 PM
This post will get us up to date. This past week, we began laying some track on the 1st two sections. The trackage is HO standard gauge, most of it handlaid ME c/55 rail on wood and PCB ties. A few stretches will be ME c/55 Flex-Track. The turnouts are all constructed on the workbench with ME c/55 rail, Proto87 frogs, and wood & PCB ties.
![[Image: IMG_0811.JPG]](http://lh4.ggpht.com/_heJ4p2qGtGQ/TTzVhEAz_GI/AAAAAAAAA7k/gmu7qfXUwjw/s800/IMG_0811.JPG)
![[Image: IMG_0789.JPG]](http://lh4.ggpht.com/_heJ4p2qGtGQ/TS6SrtjfPWI/AAAAAAAAA5Y/7exg67A3ZHY/s800/IMG_0789.JPG)
![[Image: IMG_0822.JPG]](http://lh4.ggpht.com/_heJ4p2qGtGQ/TTzUIi89_aI/AAAAAAAAA7M/wiXxCkPXB_I/s800/IMG_0822.JPG)
![[Image: IMG_0823.JPG]](http://lh3.ggpht.com/_heJ4p2qGtGQ/TTzUunXUSkI/AAAAAAAAA7U/ndB5GQImWSM/s800/IMG_0823.JPG)
Also began building up ground contours with foam. No mountains in East Texas, just easy rolling hills...
Again, thanks for looking! C & C always welcome!
Also began building up ground contours with foam. No mountains in East Texas, just easy rolling hills...
Again, thanks for looking! C & C always welcome!
Len
http://loblollylogger.blogspot.com/
Its not my job to run the train
toot the whistle or ring the bell
But let the damned thing jump the track
and see who catches Hell!
http://loblollylogger.blogspot.com/
Its not my job to run the train
toot the whistle or ring the bell
But let the damned thing jump the track
and see who catches Hell!
