01-29-2011, 11:21 AM
Work has resumed on the bridge. I took over the dinning room table again and cut and glued in the cross-members of the east tower. The heaver ones are already dry and waiting for the other side to set up.
I used a square to insure that the steel would line up at a 90 degree angle.
The first side was glued up the same way..
I used a square to insure that the steel would line up at a 90 degree angle.
My other car is a locomotive, ARHS restoration crew
