02-20-2011, 02:21 PM
Tetters, Gary, Mr. Bill, Thanks for the comments!
About the c/55 rail and flex trak - no problems so far just have to make sure the flange ways are clean of any errant ballast. The ME flex-trak seems to be harder to get straight than to curve. I just kept working it into a curve. When the ties start bunching up on the inside of the curve I just clip one out every 5 or 6 ties. The handlaid stuff is actually a little easier to do than the flex-track. I used Pliobond to stick the rail down - no spikes, not yet anyway.
As for the ModPodge water... it doesn't look very encouraging :?
About the c/55 rail and flex trak - no problems so far just have to make sure the flange ways are clean of any errant ballast. The ME flex-trak seems to be harder to get straight than to curve. I just kept working it into a curve. When the ties start bunching up on the inside of the curve I just clip one out every 5 or 6 ties. The handlaid stuff is actually a little easier to do than the flex-track. I used Pliobond to stick the rail down - no spikes, not yet anyway.
As for the ModPodge water... it doesn't look very encouraging :?
Len
http://loblollylogger.blogspot.com/
Its not my job to run the train
toot the whistle or ring the bell
But let the damned thing jump the track
and see who catches Hell!
http://loblollylogger.blogspot.com/
Its not my job to run the train
toot the whistle or ring the bell
But let the damned thing jump the track
and see who catches Hell!
