Southern Pacific Switching Layout
It has been about 6 months since I put up benchwork and I haven't made very much progress at all, During the troubleshooting stage of my wiring problem I have to disconnect most of the track from each other, So now I am back to just having benchwork set up, and not much else.

I have also been thinking about how long it is going to take to "Finish" this layout, and by "Finish" I mean have the layout be fully operational, fully sceniced, and have a decent amount of super-detailing.

I have about a year and a half to finish this layout before I go off to collage so I have been considering something smaller.
I have had my eye on the Mid-Atlantic & Western layout from the May 2001 MRR. I think that a layout that size could be built within a year and a half.

What are your thoughts?
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 8 Guest(s)