03-05-2011, 01:33 PM
Okay guys, How about this: I build a small switching layout(probably a Tymesaver) on one of my 2'x80". Once I get it up to the basic scenery stage, I will then work on building a layout across the wall with the two remaining HCDs. And I will try to work on them at a slow pace
.
Oh and by the way, I have two good collages less then an hour away from me, So I won''t have to go very far when I move
.
.Oh and by the way, I have two good collages less then an hour away from me, So I won''t have to go very far when I move
.
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Modeling the Lebanon Industrial Railway (LIRY)
