03-06-2011, 12:57 PM
Hello,
I'm following most of your posts in many forums. I'm always impressed by your plans and suggestions.
I have a N scale layout which was built for running trains in a great scenery (Somewhere West) but now I would like to build a switching layout in HO scale.
It should be set up for the modern time and your plan #1 could be a good start. I will add 4' and perhaps 6" in the depth because those 60' cars need much more place. Not speaking about the 64' reefers I'm waiting for. On the other side, I'm also trying to match old tall brick warehouses and some street running with modern "box shoes" factories.
By the way, what turnout number do you use for your drawings? I think that #6 should be a minimum for my modern time layout.
Daniel
I'm following most of your posts in many forums. I'm always impressed by your plans and suggestions.
I have a N scale layout which was built for running trains in a great scenery (Somewhere West) but now I would like to build a switching layout in HO scale.
It should be set up for the modern time and your plan #1 could be a good start. I will add 4' and perhaps 6" in the depth because those 60' cars need much more place. Not speaking about the 64' reefers I'm waiting for. On the other side, I'm also trying to match old tall brick warehouses and some street running with modern "box shoes" factories.
By the way, what turnout number do you use for your drawings? I think that #6 should be a minimum for my modern time layout.
Daniel