03-30-2011, 12:02 PM
On that spur to the left side of the plan, I agree that the space from the switch to the edge of the benchwork makes it impossible to do anything with it. I think what I would do is add a set of crossover switches to the spur just before your mainline turns to go across the top. That would give you a run around track with just enough space at the end for the locomotive to drop a cut and get around it to the other side and an additional industry spot in the top right corner of the layout.
