Southern Pacific Switching Layout
I have got all track laid and most of the layout wired! 2285_ 2285_

But unfortunately I am having problems with the turnout leading to the interchange track, Here is how I have it wired currently:
[Image: Untitled2-1.jpg?t=1302928644]

The green and red dots are feeder wires, I have them set up to a switch so I can turn them on and off, The left feeder wires are fine, but the right ones cause a short-circuit, even when I cut power to the rest of the layout.
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)