GEC's Layout Progress
well, once again i'm seriously considering changing up my layout. I think if i make my layout into an 8x9 donut, that i can rearrange the shape and configuration of my hard so that it actually works. I may also rearrange passenger stations and make it so that the layout functions more like a point to point, with a "connecting" track to allow for continuous running. I haven't quit figured out how i want to do it yet, but i do at least have the new yard figured. it would fit on the same space as the old yard, but it would be pointed "off" the table (the oval would have to be interupted here).

I'll post pictures when i have something more reasonably planned.


I also recently got a new Silverliner III. I'm sure i mentioned it, but here it is-

[Image: p4180021.jpg]

I also pulled out my Arrow III MU kits. these have to get done sometime soon, they're to awesome to sit in boxes.

[Image: p4180013j.jpg]

[Image: p4180016.jpg]
Modeling New Jersey Under the Wire 1978-1979.  
[Image: logosmall.png]
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 3 Guest(s)